Algebra  K9Running the cold water tap fills a bathtub in 15 minutes, while running the hot water tap fills it in 20 minutes.
If the plug is pulled out when the tub is full, it take 12 minutes to empty.

How long does it take to fill the bathtub with both taps running and the plug out?